Real projects. Real results. Real ROI. See how enterprise organizations solved complex exterior maintenance challenges with Aeronex robotics solutions.
San Diego, CA • Historic Commercial Building
150-year-old historic building required facade cleaning without damaging original stonework. Traditional rope access posed safety risks and would damage delicate masonry.
Deployed Skydio X10 with precision control to document facade condition and identify problem areas. Used Lucid Bots Sherpa with low-pressure system for gentle cleaning.
time Reduction
75% faster than traditional methods
cost Savings
$45,000 vs rope access alternative
safety Improvement
Zero worker exposure to heights
preservation
No damage to historic materials
Estimated Annual Value
$18500
Orange County, CA • Industrial Manufacturing Facility
Large manufacturing plant (240,000 sq ft) required quarterly exterior cleaning. Downtime during maintenance cost $8,000/hour. Traditional methods required 3-week project timeline.
Implemented scheduled quarterly Aeronex service with rapid deployment. Minimal facility disruption—work completed during off-hours.
time Reduction
Completed in 4 days vs 21 days traditional
cost Savings
$112,000 in avoided downtime
efficiency
Quarterly maintenance program established
roi
ROI achieved in first service
Estimated Annual Value
$22500
San Diego County, CA • Warehouse Complex (45ft height)
Multi-building warehouse complex with 850,000 sq ft of exterior surfaces. Mold and algae growth affecting building appearance and tenant satisfaction. Scaffolding quotes exceeded $65,000.
Deployed Lucid Bots Sherpa for comprehensive exterior cleaning across all buildings. Documented before/after with Skydio X10 for property records.
cost Savings
$42,000 vs scaffolding alternative
time Reduction
Completed in 6 days
tenant Satisfaction
100% tenant satisfaction improvement
preventive Maintenance
Quarterly program established
Estimated Annual Value
$19800